Swift Plumbing - Port Townsend Maritime Center, Heat Exchanger Installation
The Maritime Center was recently built in Port Townsend. The HVAC system was designed to take advantage of the cool waters of Puget Sound through a heat exchanger mounted on the piling at the end of the pier. We secured the stainless steel components to the piling and connected HDPE piping under the pier to the HVAC equipment located inside the building.
Quicklinks
Project Details
Provided dive assistance with installation of underwater heat exchanger as part of a new HVAC system.
January 12 - 16, 2009