Pit 5 Stem Guide Protection

Pacific Gas & Electric (2011)
Stem guide protection welded onto face of bulkheads.
Lowering Stem Guide Protection
Quicklinks
Slideshow

USCG - Orphan Well Leaker

US Coast Guard (2011)
Prepare location for lift boat to set up and conduct well abandonment
USCG - Orphan Well Leaker
Quicklinks
Slideshow

Canyon Ferry Stoplog Guide Removal

US Department of Interior - Bureau of Reclamation (2011)
Providing project management and diving services to remove existing stoplog guides from face of dam
dive barge, canyon ferry dam, stoplog guide removal project
Quicklinks

Relief Reservoir

Pacific Gas & Electric (PG&E) (2011)
High altitude diving to install blind flanges on upstream end of dam outlet works
heavly lift helicopter, mobilizing to remote job site, diving at altitude
Quicklinks
Slideshow
Video

Platform Decommissioning

Wild Well Control, Inc. (2011)
Provided mixed gas diving services to assist with removal of a 8-pile platform jacket
Quicklinks
RSS
Slideshow

Pipeline Abandoment

(2011)
Provided barge and mooring to assist with pipe line abandonment operations, 40 feet from production platform leg and over subsea oil and gas manifold.
Quicklinks

2011 Dix Dam Face Slab Repair

Kentucky Utilities Company, E.W. Brown Generating Station (2011)
Construction contract for debris removal and maintenance on and around the face slab at Dix Dam. Work period June –Dec 2011.
dix dam face slab repair
Quicklinks
Slideshow

South Timbalier 196 B - Platform Removal

Dynamic Offshore Resources (2011)
Provide surface dive equipment and personnel to facilitate removal of the platform jacket
Platform to be removed from 105 feet of water.
Quicklinks

Seawater Intake Lines - Modification & Cleaning

Alaska SeaLife Center (2011)
Prime contractor on project to modify and clean intake lines using deep gas diving techniques and rovs.
dive crew seward alaska sealife center
Quicklinks
Slideshow

Bay Tunnel - Ravenswood Portal

San Francisco Public Utilities Commission (2011)
Assisting with installation of a tremie plug to seal the bottom of TBM launch shaft.
Dive operations set up portal edge for the Bay Tunnel
Quicklinks
RSS