Cheesman Dam Upstream Control Project - Phase 1

Denver Water (2010)
Project management for control structure, electrical upgrade throughout site and diving services to install three new outlet gates on face of dam.

Canyon Dam Outlet Tower

Pacific Gas and Electric (PG&E) (2007)
Replacement of 80 feet of stem, guides and roller assemblies in an outlet tower in Lake Almanor.

Underwater Installation of Inlet Gate

Denver Water (2003)
Installed a 10-ton hydraulic gate on the upstream side of a high-elevation reservoir in 220 feet of water.