Olmsted Lock and Dam

US Army Corps of Engineers (2008)
Furnishing equipment and labor for diving and diving-related services in support of the contractor’s Olmsted Dam construction effort.

Cheesman Dam Upstream Control Project - Phase 1

Denver Water (2010)
Project management for control structure, electrical upgrade throughout site and diving services to install three new outlet gates on face of dam.

BP Properties

Wild Well (2009)
Performed Hurricane remediation work on several destroyed platforms

The Dalles Bay 8/9 Spillwall

US Army Corps of Engineers (2008)
Provided diving services to assist with the installation of a wall to direct migrating salmonids to deeper water.

New York Water Supply

New York DEP (2007)
Saturation dive project to provide non-destructive testing, selective demolition, and construction support in 685 feet of water.

Bull Run Dam 1 Outlet Works Improvements Phase 1

Portland Water Bureau (2009)
Project involves removal and replacement of stems, guides and actuators on 7 outlet gates, removal of and remounting of gate and repairs to spillway.

L/B Respect Salvage

Superior Energy (2009)
Salvage damaged jack-up rig

Energy Quest

Wild Well (2009)
Providing well intervention support

Pit 5 Instream Flow Release Modifications

Pacific Gas & Electric (2009)
Global Diving & Salvage, Inc. provided underwater and surface welders to install 9 outlet gates inside the Pit 5 four existing gates.

Carkeek/Richmond/Alki Outfall Repair - Alki

King County - Wastewater Treatment Division (2009)
Upgraded the cathodic protection system on Alki outfall, and installed five anode sleds in 100 feet of water.

Carkeek/Richmond/Alki Outfall Repair - Richmond Beach

King County - Wastewater Treatment Division (2009)
Moved existing sediment to allow for removal and replacement of outfall diffusers in 150 feet of water.

Carkeek/Richmond/Alki Outfall Repairs - Carkeek

King County - Wastewater Treatment Division (2009)
Replaced 11 steel diffusers with new HDPE diffusers in 200 feet of water. Divers used a combination of helium and oxygen.

Wharf Piling Repair

Port of Anchorage (2009)
Cleaned damaged steel piling with high-pressure water blasting, installed steel jackets and grouted in place.

BP Platform Recovery Project

BP (2008)
Provided saturation- and surface-supplied diving services for subsea wellhead interventions, platform remediation, and platform removal work.

BP Platform Recovery Project

(2008)
Provided saturation- and surface-supplied diving services for subsea wellhead interventions, platform remediation, and platform removal work.

Boat Ramp Upgrade

Conoco Phillips Ferndale Refinery (2008)
Removed existing woodpile-supported boat ramp, and replaced with new steel piling and galvanized steel frame and track components.

Red Dog Mine Dock Inspection and Maintenance

Cominco Alaska (2008)
Performed inspection and maintenance services on the Red Dog Mine's dock and loading cells.

USCG Kodiak Fuel Dock

United States Coast Guard (2008)
Installed anodes on a USCG fuel dock.

Hurricane Recovery Team

Chevron (2007)
Conducted a saturation diving project, including structural removal, wedding cake and wellhead operations.

Stone Energy Platform Remediation

Stone Energy (2007)
This saturation dive project included installing wellheads and assisting with P&A operations.

Rimrock Reservoir

Tieton Hydropower (2007)
Assisted a hydroelectric operator with modifications to an existing trash screen.

Hurricane Ivan Platform Recovery

Noble Energy (2006)
Support services for wellhead and platform operations.

Canyon Dam Outlet Tower

Pacific Gas and Electric (PG&E) (2007)
Replacement of 80 feet of stem, guides and roller assemblies in an outlet tower in Lake Almanor.

Hurrican Ivan Platform Recovery

Noble Energy (2005)
Saturation diving services aboard a DP III vessel in the Gulf of Mexico to support the oil-field remediation work.

Priest Rapids Dam Spillway Apron and End Sill Underwater Concrete Repair

Grant County PUD (2006)
Repaired several areas of the ogee, stilling basin, and end sill of Priest Rapids Dam.

French Meadows Low-Level Outlet Cylinder Replacement

Pacific Gas and Electric (PG&E) (2006)
Replacement of a leaking hydraulic cylinder used to operate an outlet gate.

Natural Gas Pipeline Replacement

Pacific Gas and Electric (PG&E) (2006)
Assisted with the removal and realignment of 1,000 feet of 10-inch natural gas pipeline, due to new Bay Bridge footing installations.

Ensco 64 Debris Removal and Salvage

Titan Maritime (2004)
Saturation dive project to recover debris, BOP, and salvage jack-up legs.

Subsea Pipeline Spool Piece Installation

Unocal Corporation (2004)
Pipeline spool piece replaced in Cook Inlet utilizing specialized equipment.

Underwater Installation of Inlet Gate

Denver Water (2003)
Installed a 10-ton hydraulic gate on the upstream side of a high-elevation reservoir in 220 feet of water.

Pipeline Riser Conversion 2001

(2001)
We repaired a pipeline riser to re-establish the use of a subsea product line in Cook Inlet.