Drill Shaft Extraction

Becho Inc. (2012)
Repair to rotating shaft casing in 110 feet of water within metropolitan San Francisco.
Becho Project Job Site
Quicklinks
Slideshow

Pit 5 Stem Guide Protection

Pacific Gas & Electric (2011)
Stem guide protection welded onto face of bulkheads.
Lowering Stem Guide Protection
Quicklinks
Slideshow

Pile Cut Off

Northwest Demolition and Dismantling (2011)
Pile demolition and removal.
Excavator Pulling a Pile
Quicklinks
Slideshow

Valve Removal & Replacement

Musco Family Olive Ranch (2011)
Removed and replaced two existing slide gate valves
Musco Family Olive Ranch - Dive Station
Quicklinks
Slideshow

Platform Decommissioning

Wild Well Control, Inc. (2011)
Provided mixed gas diving services to assist with removal of a 8-pile platform jacket
Quicklinks
RSS
Slideshow

Manette Bridge Replacement Project - Sheetpile Cutoff

Washington State Department of Transportation (2011)
We are providing dive platform and divers to cut existing sheet pile from perimeter of bridge footing.
Manette brideg replacement
Quicklinks
RSS
Slideshow

Nanuq Inspection

(2011)
Divers accessed intake piping inside of sea chests.
Quicklinks

South Timbalier 196 B - Platform Removal

Dynamic Offshore Resources (2011)
Provide surface dive equipment and personnel to facilitate removal of the platform jacket
Platform to be removed from 105 feet of water.
Quicklinks

Seawater Intake Lines - Modification & Cleaning

Alaska SeaLife Center (2011)
Prime contractor on project to modify and clean intake lines using deep gas diving techniques and rovs.
dive crew seward alaska sealife center
Quicklinks
Slideshow

Tanana Bridge #505

State of Alask Department of Transportation and Public Facilities (2011)
Divers assisted with removal of large concrete debris using underwater explosives.
Quicklinks