Task Order 3 Bridge Inspection

DOT (2011)
Underwater inspections on marine and fresh water structures.
DOT Bridge Inspection - Dressing Diver
Quicklinks
Slideshow

Lake Don Pedro Salvage

(2010)
Locate and inspect a sunken vessel.
Quicklinks

Port Townsend Maritime Center, Heat Exchanger Installation

Swift Plumbing (2009)
Provided dive assistance with installation of underwater heat exchanger as part of a new HVAC system.
Quicklinks

Rimrock Reservoir

Tieton Hydropower (2007)
Assisted a hydroelectric operator with modifications to an existing trash screen.
Quicklinks

24hr Facility Booming - Pt. Wells, WA

Paramount Petroleum (2006)
Global provides 24-hour preventative booming service coverage for Paramount Petroleum located at Point Wells.
Quicklinks
Slideshow