Sound Developer Removal

US Coast Guard (2011)
Secure and raise vessel from seafloor, transport to adjacent tideland for proper disposal.
Air bags used to rasie sunken vessel, AK
Quicklinks
RSS
Slideshow

Pipeline Abandoment

(2011)
Provided barge and mooring to assist with pipe line abandonment operations, 40 feet from production platform leg and over subsea oil and gas manifold.
Quicklinks

Subsea Pipeline Spool Piece Installation

Unocal Corporation (2004)
Pipeline spool piece replaced in Cook Inlet utilizing specialized equipment.
Quicklinks

Cook Inlet Pipeline Burial

Forest Oil (2004)
Completed inspections, maintenance, and pipeline burial.
Quicklinks
Slideshow

Abandoned Pipeline Decommissioning

(2002)
Decommissioning of abandoned pipeline, including excavation work, hot tapping, and pipeline alignment.
Quicklinks
RSS

Pipeline Riser Conversion 2001

(2001)
We repaired a pipeline riser to re-establish the use of a subsea product line in Cook Inlet.
Quicklinks