Cheesman Dam Upstream Control Project - Phase 1

Denver Water (2010)
Project management for control structure, electrical upgrade throughout site and diving services to install three new outlet gates on face of dam.

Hurricane Recovery Team

Chevron (2007)
Conducted a saturation diving project, including structural removal, wedding cake and wellhead operations.

Hurrican Ivan Platform Recovery

Noble Energy (2005)
Saturation diving services aboard a DP III vessel in the Gulf of Mexico to support the oil-field remediation work.

Ensco 64 Debris Removal and Salvage

Titan Maritime (2004)
Saturation dive project to recover debris, BOP, and salvage jack-up legs.

Underwater Installation of Inlet Gate

Denver Water (2003)
Installed a 10-ton hydraulic gate on the upstream side of a high-elevation reservoir in 220 feet of water.