NuStar Energy SPM Hose Replacement

NuStar Energy (2011)
Assisting with replacment of exisitng hose from PLEM to SPM buoy
NuStar SPM (Sinlge Point Moor)buoy
Quicklinks
Slideshow

Wild Well / Mariner Oil Platform Removal

Mariner Oil (2011)
Removal of damaged Platform B in block EI 292
Quicklinks
Slideshow

SMI Clean Out

ATP (2010)
Provided saturation diving system and personnel to locate and remove a paraffin blockage in oil flow line
Quicklinks

Anaconda Mat Installation

Cal Dive / Enterprise (2010)
Installation of post mats on the Anaconda natural gas pipeline crossings
Quicklinks
Slideshow

L/B Respect Salvage

Superior Energy (2009)
Salvage damaged jack-up rig
Quicklinks

DSV Ocean Carrier with GDS SAT II

(2009)
We have partnered with OS3 to provide a DPII vessel with ABS classed saturation dive system.
OS3's DSV Ocean Carrier & GDS' SAT II mobilize for a project
Quicklinks
RSS

BP Pompano - Subsea SCR tie-back

BP (2009)
Installed 15 riser clamps used to tie-in 6" pipe line.
Quicklinks
Slideshow

BP Platform Recovery Project

BP (2008)
Provided saturation- and surface-supplied diving services for subsea wellhead interventions, platform remediation, and platform removal work.
Quicklinks
Slideshow

Stone Energy Platform Remediation

Stone Energy (2007)
This saturation dive project included installing wellheads and assisting with P&A operations.
Quicklinks

Hurricane Ivan Platform Recovery

Noble Energy (2006)
Support services for wellhead and platform operations.