Projects

Mariner Oil Platform Removal

Wild Well Control, Inc (2011)
Removal of damaged Platform B in block EI 292
Quicklinks
Slideshow

Caisson Drydocking

Everett Shipyard (2011)
Provided two dive teams to assist with drydocking of graving dock gate
Quicklinks
Slideshow

M/Y SCOUT Salvage

Insurance Company (2010)
Ocean recovery, refloating and defueling of classic Ed Monk design 63’ wooden yacht.
Quicklinks
Slideshow

Lake Don Pedro Salvage

(2010)
Locate and inspect a sunken vessel.
Quicklinks

SMI Clean Out

ATP (2010)
Provided saturation diving system and personnel to locate and remove a paraffin blockage in oil flow line
Quicklinks

Asarco - Ruston Yard Cleanup

United States Corps of Engineers (2010)
Providing assistance with the removal of contaminated soil from household yards in the Ruston area of Tacoma.

Project Tags


Quicklinks

King River Powerhouse Repairs

Pacific Gas & Electric (2010)
Divers work in a confined space to make repairs on a powerhouse surge shaft
Quicklinks
Slideshow

Pile Removal

CS Marine (2010)
Removal of 50 pilings from the Shell Refinery Wharf approach way
Quicklinks
Slideshow

Salvage Support for Sunken Tug

(2010)
Provided dewatering and pollution control for the refloating of a tugboat.
Quicklinks
Slideshow

Chenega Dock Restoration & Boat Recovery

(2010)
Dock renovation and recovery of the M/V Mirage

Project Tags


Quicklinks
Slideshow

Piling Repair

Puget Sound Naval Station (2010)
Piling repairs and maintenance, underwater demolition, and fender repairs
Quicklinks

Montezuma Depth of Burial Survey

Calpine (2010)
Providing diving services to determine depth of burial of an existing High Pressure natural gas pipeline that crosses the Sacramento
Quicklinks