Hood Canal Bridge Band Removal
Washington State DOT determined that to avoid galvanic corrosion, two stainless steel bands that had previously been installed on one of the Hood Canal Bridge’s anchor cables needed to be removed; Global was awarded the small works project bid. The team mobilized to the site on Global’s Prudhoe Bay and used their Falcon ROV to …