Fisherman’s Terminal Pile Improvements

The under-dock piling of Piers 3, 4 and 5 at historic Port of Seattle Fishermen’s Terminal required pile improvements, including cleaning, wrapping, and installation of a cathodic protection system, in order to increase the life span of the aging facility. Global inspected, cleaned, coated, and wrapped 293 steel piles with Denso SeaShield 2000HD pile protection …

Belize Pile Wrap Installation

Global was recently contracted to perform a large pile wrap installation project in Belize.  Contracted by PND Engineers, Global inspected and wrapped 113 steel piles on the Norwegian Cruise Line (NCL) docking pier on the island of Harvest Caye in Belize. Working around the active cruise ship schedule, the divers first performed a Level 1 …

Salty’s Understructure Repairs

A popular restaurant featuring views of Elliot Bay and downtown Seattle, Salty’s is located in a 100-year old former mill building built over the water. The substructure consisted of piles and beams; it had undergone numerous changes and repairs through the years but much of the supports had deteriorated significantly and needed to be replaced. …

Terminal 18 Pile Wrap Repair

In the winter of 2016, inspections showed numerous concrete piles at the Port of Seattle’s Terminal 18 were structurally compromised and in need of repair. The Port’s engineers selected QuakeWrap’s PileMedic system as an appropriate product for the structural repairs.  Global was awarded the bid to perform the work, which included the installation of the …