Project Tag: rov inspection

Marine Outfall ROV Inspection

The Brightwater Marine Outfall was constructed and deployed in 2008 and came online in September 2012. Shortly after leaving the shoreline near Point Wells, WA, the pipeline branches into two parallel 84” HDPE outfall pipelines; diffuser ports are located on the last 250 linear feet of each pipe along with steel access gate structures. Semi-annual …