Project Tag: SAT diving

Gross Dam Trashrack Modifications

The Primary Outlet Works trashrack structure at Gross Dam was constructed with the dam in 1955; it was comprised of a 25-foot rectangular reinforced concrete frame structure with 27 steel trashrack panels. In 2004, modifications were made by Global to remove two concrete beams and install replacement steel beams and bracings after the installation of …