PROJECT DETAIL
Global’s dive crews performed a post mat installation on the Anaconda pipeline. The pipeline runs through the Green Canyon block of the Gulf of Mexico in 100 to 400 fsw. Mats located in 100 fsw or less must be jetted into the seafloor. Global’s team performed numerous saturation dives to install the post mats along the various crossing points of the 137 mile long Anaconda 24″ natural gas pipeline.