PROJECT DETAIL

NuStar Energy SPM Hose Replacement

April , 2011

Working off the DSV DPII Ocean Carrier, Global provided saturation diving services as required to disconnect the existing dual 24″ hose section from the PLEM (Pipe Line End Manifold) on the seafloor. Once the existing hoses were removed from the SPM (Single Point Moor) buoy on the surface, they were properly disposed of. New hoses were then reattached to the SPM and the divers connected them to the PLEM on the seafloor.